Pop-up stores
& temporary retail
Open fast,
close without a trace
From a weekend activation to a seasonal store. In-house production, on-site installation and a teardown that leaves the space exactly as it was.
- No-build systems, suitable for rented premises
- Installed in a single day, open the next
- Elements reusable across activations
Tell us about your pop-up
We reply the same business day.
Request a quote No obligation · we reply todayPop-ups that have
already opened and closed

Venca
View project →
Vodafone
View project →
Vodafone
View project →
Vodafone
View project →
Škoda eventos
View project →
Vodafone
View project →
Head & Shoulders
View project →
RETA
View project →What a pop-up store is and when it pays off
A pop-up is a shop or brand space that opens for a limited time: a weekend, a few weeks or a season. It goes into an empty unit, a shopping centre, another store or onto wheels, and comes down leaving the space as it was. That is why it is built with no-construction systems: freestanding structures, fabric graphics, removable vinyl and modular furniture.
It pays off when you want to test a location before signing a long lease, launch a product, make the most of a campaign such as Christmas or summer, or take the brand to several cities with the same build. If the shop is going to stay for years, a permanent fit-out works out better, and we will tell you so.
Here we focus on the temporary build: duration, systems and dismantling. For trade fairs see trade show stands, for opening a permanent shop launches and openings, and every option in events.
A weekend is not
the same as a quarter
What determines how a pop-up is built isn't the design, it's how long it will stand. That's what drives the construction system, the materials and the budget. These are the scenarios we build for.
One to three days. Everything has to go up in a few hours and come down just as fast, so it's built with self-supporting elements, textile graphics and lightweight furniture. Nothing that needs fixing in place or drying time.
Request a quote →The most common format. It already allows for a more ambitious fit-out: shop-window vinyls, adhesive mural graphics, a counter and dedicated signage. All using removable systems.
Request a quote →One to three months, typically for a Christmas or summer campaign. At this length it's worth investing in sturdier elements and lighting, because the cost is spread across many more days of sales.
Request a quote →A space inside another store or a shopping centre. The challenge isn't the duration but fitting in with the surroundings, meeting the centre's rules and standing out just enough.
Request a quote →The same setup travelling through several cities. Designed from the outset to be assembled and disassembled many times, with everything labelled and packed by module.
Request a quote →Without touching the interior: just the shop window, which is the cheapest intervention and gives the most impact per euro in a short campaign.
Request a quote →No-build systems
and a clean teardown
In ephemeral retail you're almost always working in a rented space with strict conditions: don't touch the walls, leave no marks, and hand it back exactly as it was. The whole system is chosen with that in mind.
Removable wall vinyl
Controlled low-tack adhesive for mural graphics: comes off with heat, leaving no residue and without lifting paint.
Self-supporting structures
Walls and display units that stand on their own, with no anchoring to the ceiling or the walls. This is what makes it possible to work in premises where drilling isn't allowed.
Interchangeable textile graphics
Fabric tensioned on a profile: the same structure serves several campaigns, only the fabric changes, and it travels folded.
Modular furniture
Demountable counters and display units that reconfigure to fit the store's floor area and get stored between activations.
Lighting on a standalone track
Tracks powered from an existing outlet, with no changes to the store's electrical installation, which is usually forbidden under short-term leases.
Packing and storage
Every element has its own packing and label. This is what makes a roadshow viable and keeps the installation from degrading between cities.
How we work
From empty premises
to opening day
- Step 01
Site visit and lease conditions
We measure and, above all, read what the lease allows: what can be touched, what has to be returned intact, and the window available for installation and teardown.
- Step 02
Proposal matched to the duration
We define the construction system based on how many days it will be standing. Overbuilding a three-day pop-up wastes money; underbuilding a three-month one costs you later.
- Step 03
Production and pre-assembly
We produce and, for complex or touring installations, pre-assemble in the workshop to time the real installation and catch problems beforehand.
- Step 04
Installation, opening and teardown
We install within the agreed window, leave the store ready to open and, once the campaign ends, dismantle everything and hand the space back as it was.
Which pop-up format to choose
The six formats suit different durations and goals. This is the quick comparison we go through when putting the proposal together.
| Format | Typical duration | Installation | Reusable | Relative investment |
|---|---|---|---|---|
| Weekend activation | 1 to 3 days | Hours | Almost everything | Low |
| 1 to 4-week pop-up | 1 to 4 weeks | One or two days | The structure | Medium |
| Seasonal store | 1 to 3 months | Two or three days | Furniture and lighting | Medium-high |
| Corner and shop-in-shop | Weeks or months | Outside store hours | Yes | Medium |
| Touring roadshow | Several cities | Hours at each stop | That is the point | High at first, low per stop |
| Campaign window | Weeks | A few hours | Graphics are single-use | Low |
What moves the investment most is not size but how long the build has to last and how many times it will be reused.
Tell us your dates and venue and we will suggest a format →How we price a pop-up
We do not publish fixed rates because every pop-up depends on the venue, how many days it is open and whether the build has to travel. These are the factors that move the figure:
Duration
A few days calls for light materials; a season, finishes that stand up to daily use.
Floor area and height
How many metres of wall need dressing and whether a structure of its own is needed.
Lease conditions
Whether walls can be touched or everything has to be freestanding.
Furniture and displays
Stock, modular or made for the brand.
Lighting and power
Self-contained track, screens or light boxes, and where they are powered from.
Reuse
If the build travels to other cities, it is designed to go up and come down many times.
Installation hours
In shopping centres installation usually happens at night or outside opening hours.
Google reviews
What our clients say
5,044 reviews on Google
5/5
Muy buena experiencia con Unical Graphic. Me ayudaron con el montaje de un stand en una feria del sector farmacéutico y el resultado fue impecable. Destacan por la calidad del acabado, la rapidez y lo fácil que hacen todo el proceso.
YagoGoogle · Original review in Spanish
5/5
Me acompañaron en todo el proceso y cumplieron con el plazo de entrega pese al tiempo tan ajustado y las modificaciones de última hora. Muy contentos con el resultado!
Victor Gonzalez GalvezGoogle · Original review in Spanish
5/5
Los mejores profesionales del sector en la zona. Calidad de impresión y montaje excelente, pero el servicio y el trato recibido está a otro nivel.
Oktoberfest Barcelona VIPGoogle · Original review in Spanish
We answer your questions
Everything people ask us before commissioning a pop-up or ephemeral retail space: lead times, permits, materials, installation and warranty.
Can't find your question?
Ask us directlyHow long does it take to install a pop-up?
Can it be installed without touching the walls?
What happens at teardown? Does the store end up as it was?
How do I decide how much to invest based on how long it runs?
Can the installation be reused in another city or campaign?
Do you need a licence for a pop-up?
Can you also produce the furniture and display units?
What if the opening date moves earlier?
Do you manufacture yourselves, or do you subcontract?
Where do you manufacture and install?
Request your quote
Open on time, close without a trace
Tell us about the premises, the duration and the opening date. We'll give you a proposal and a fixed quote within 24 business hours.


